
| Technology of installation |
|
|
|
| Written by Administrator |
| Thursday, 17 September 2009 16:17 |
|
Before you a management on fastening of front panels on the low Buildings. Attentively read it before beginning works on installation. For installation one assistant is required to you at least, and it is ideal, if it was The trained carpenter or the mason. Panel PLITKER represents the reinforced composit panel, Which consists of two parts: • a finishing layer; • a heater layer. ![]() The finishing layer is made from klinkern tiles, seams are filled by a solution, Which is made of cement and a polymeric substance. Finishing The layer does the panel steady against climatic influences and gives to it Mechanical durability. To facilitate panel installation, under a finishing layer Metal assembly washers are fixed. The heater layer consists from penopoliritan from the reinforcing glass-fiber Grid. Used in quality expanded polystyrene gives Designs ease also keeps isolation properties. Shpuntovoe connection of panels guarantees moisture resistance and wind proof Coverings. Front panels PLITKER consist from klinkern tiles (drawing «under a brick») In the size 240x71x10 mm. The size of standard panels: length of 1262 mm, height of 570 mm and a thickness of 46 mm. ![]() The finishing layer is made from klinkern tiles, seams are filled by a solution, Which is made of cement and a polymeric substance. Finishing The layer does the panel steady against climatic influences and gives to it Mechanical durability. To facilitate panel installation, under a finishing layer Metal assembly washers are fixed. The heater layer consists from penopoliritan from the reinforcing glass-fiber Grid. Used in quality expanded polystyrene gives Designs ease also keeps isolation properties. Shpuntovoe connection of panels guarantees moisture resistance and wind proof Coverings. Front panels PLITKER consist from klinkern tiles (drawing «under a brick») In the size 240x71x10 mm. The size of standard panels: length of 1262 mm, height of 570 mm and a thickness of 46 mm. Tools and materials for works on fixture of panels: • the puncher • a circular stone-cutting saw • a working knife • a board • a metal hammer • penopoliritan • neutral silicone squelches, screws, washers Or assembly glue with a pistol • electro screwdriver • a cord • level • the tool for cutting seams (Short and long) • a starting profile Also, except panels, it be required to you delivered with them in the complete set Pasted tiles and a seam solution. For facing of corners of buildings are used The big angular sections (240/870x570 mm), for lateral and top facing Apertures – small angular sections (240/240x570 mm). Angular sections are as The right - and link sided, them establish the friend over the friend alternately and Fix on frame racks according to the instruction. ![]() ![]() 1. A skeleton construction 1.1. The skeleton construction should be begun with external corners of a building. Establish at The help of metal corners angular racks wooden or metal Skeleton vertically on distance of a thickness of a planned layer of the additional (δ) from an available wall on building corners as it is possible for a thermal protection further from Available joint of a corner of a building. ![]() 1.2. Similarly establish the angular Frame racks on all external corners of a building. In Internal corners of a building establish vertically Skeleton racks on distance (δ) thickness Heat-insulation layer from a wall. Place Them as it is possible is more close to each other, but do not join. Before definitively to fix skeleton racks in Internal corners, place behind them additional Heat-insulation layer – later it will be very difficult To make. 1.3. For vertical and horizontal installation of the frame fixed further Racks pull a cord, having connected extreme frame racks on the external Skeleton surfaces above and in the bottom of a wall. 1.4. Check up, whether remains between a wall and a cord in all Points of a wall space, sufficient for skeleton and placing installation Additional heat-insulation layer. If necessary it is a little more Remove angular racks of a skeleton from a wall. 1.5. Following racks of a skeleton place vertically so that distance from Points of intersection of mental direct extension pieces разметочных cords lateral Walls to an axis of the second rack of a skeleton made 195 mm. The third frame rack Arrange on distance of 632 mm from previous (distance from an axis of a rack to Rack axes). ![]()
![]() 1.8. The subsequent vertical frame racks establish in a plane, Set a cord so that the rack axis has defended from Edges established before a lateral rack of an aperture on distance of 195 mm. The same In the way establish the second horizontal frame element over an aperture. Repeat the specified steps on each aperture. 1.9. Installation of ordinary racks of a skeleton, as well as later fixture of front panels, Begin from the left corner of a wall. Arrange vertical racks of a skeleton in The plane set by a cord, with step of a skeleton of 632 mm (distance From an axis of a rack to a rack axis), interrupting racks in places of apertures. 1.10. Measure distance from last ordinary rack to the established Before the third rack from the right corner (or the third from a corner of an aperture of a rack). If It makes less than 240 mm, and also, if in drawing «under a brick» walls There can be deviations (short pieces of tiles), during installation works It is necessary to saw not only last standard panel, but also to truncate Penultimate, shifting accordingly last ordinary racks of a skeleton To the left, so that laying drawing was not broken. ![]() 1.11. In the same way establish ordinary racks of a skeleton on all walls. So, the skeleton for installation of front panels is ready. Prior to the beginning of installation of the front Panels if necessary make installation of an additional layer Heater Seams between plates of an additional heater follows To fill or hermetically to close, also it is necessary To fill possible cracks between a heater and racks Skeleton. 2. Height marking on building corners 2.1. On an angular frame rack note height of a bottom edge of the first row Panels. Then measure and designate a point located above first on 50 mm. So you receive level of height of an upper edge of a back part of the starting Profile. By means of a level or разметочного a cord and level put this Mark horizontally on all frame racks. In order to avoid the superfluous expense of a material and for reduction Waste whenever possible try to choose in height Covered part of a wall full multiple height of the panel. 2.2. The starting profile should be made of the zinced steel tin In the thickness not less than 1 mm. The profile on a bend is recommended to be punched, Having drilled through each 20 sm of an aperture in diameter of 2 mm. ![]() ![]() 2.3. Arrange an upper edge Starting profile on the available Mark of height also fix it Horizontally on a skeleton. 2.4. Fix clips on Starting profile on everyone To frame rack. 3. Installation of front panels Installation of front panels begin with the left corner of a wall, moving ahead on one To a number. Correct installation of the first angular section, just as And first row installation, is a basis correct Installations of all facade. Therefore operate attentively. The first row should be established absolutely Horizontally and on one line over a starting profile. 3.1. Insert left - or right-hand The big angular section over the starting Profile and strongly press it downwards, While a groove located in the bottom part Insulating layer of a detail, completely Will not sit down on clips. Be convinced that edges Panels on either side of angular section Get to an axis of a frame rack. If It not so, at installation of the frame Racks the error, which has been admitted It is necessary to correct. Then from both The parties check up vertical position of details, Establish on thorns clips and attach Screws to a skeleton. ![]() 3.2. For hermetic sealing of vertical joints Panels put on external edge of a thorn Panels thin silicone «колбаску». Silicone 3.3. Then join the following panel, having pressed so that connecting thorn The previous panel has entered into a following groove, and panels would appear pressed As much as possible densely, and the groove in the bottom part of an insulating layer completely would sit down On clips. 3.4. Check up horizontal position of the panel and its height, fix a screw In an upper berth of fastening in the middle of the panel. Preliminary for a head Screw make 5-millimetric deepening in a seam solution. 3.5. Track vertical position of the panel, establish on thorns clips and Attach screws to a skeleton, and also twist the bottom screw in the middle Panels. 3.6. In the same way establish following standard panels, watching for Horizontal position and vertical position of the established panels. 3.7. When will appear on distance of the third frame rack from an aperture, begin Installation of section round an aperture, first of all having established the top crosspiece Aperture for what use small angular sections. If necessary Saw off lateral parts of a crosspiece or add a strip of the standard panel. For Receptions of correct result try to make a crosspiece of the integral Tiles, cutting off angular sections on a seam. Extreme sections of a crosspiece fix From below by means of screws and the zinced washers (diameter not less than 15 mm) not Further than in 20 mm from detail edge, that the lateral detail established later Has closed a fixing screw. End faces of angular section and the top part of a crosspiece Fix clips through шпунт. Each small angular section should be It is fixed not less than in six points. 3.8. For furnish of sides of an aperture establish small angular sections, at Necessities cutting details already or more shortly. Be convinced that the horizontal The line of a seam of angular details coincides with a line of a seam of the established standard Panels. Each small angular section should be fixed not less than In six points. 3.9. If it is required to cut the standard panel adjoining to the angular Sections (item 1.10 see also), note on the panel a cut edge and cut the panel From outside klinkern surfaces. At a cutting always saw off klinkern the panel layer on 5 mm is shorter in comparison with an insulating layer, For formation of a vertical seam. A shpuntovoj groove which remains between Layer of a heater of the sawn panel and angular section (if it is not present, it is necessary it To cut out, for example, a knife with cross-section section 15х15 mm), directly Before panel installation fill уретановой with foam. Establishing sawn off Panel piece, fix its clips not less than in four corners . 3.10. If necessary, having reached the following angular section, operate as. Installation of a starting profile and angular sections, installation The first row of panels and crosspieces – the most important stages All process of installation. Special attentiveness on this Stage allows to avoid problems at following stages. If you carry out for the first time installation works, We recommend to begin with the most latent from strangers Eye of a part of a building. 4. Installation of following numbers of panels 4.1. For hermetic sealing of horizontal connecting seams of panels put Thin silicone «колбаску» on external edge connections in The top part of the established panel. ![]() 4.2. At first establish the big angular section of the first corner, this time Directed to an opposite side, comparing to a section direction The bottom number. Then fix standard panels and sections of corners. That To avoid coincidence of four corners of insulating panels, standard panels Are mounted : each following number moves on half of length Panels in comparison with the previous. If necessary establish drain laths (the external Window sills) before installation of lateral details of a window aperture. Constantly watch horizontal position and vertical position Panel numbers. Rigid, them it is impossible for panel PLITKER To bend, stretch or squeeze. |
| Last Updated on Wednesday, 14 April 2010 20:28 |




















