• An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
Plitker
PDF Print E-mail
Written by Administrator   
Thursday, 17 September 2009 14:42

Welcome

 

Front thermopanels for today are the best means of warming and facade updating. You can perfectly combine the beautiful ideally erected facade, with modern system of power savings. The facade design is extraordinary simple. The facade is completely mounted by front thermopanels with use klinkerns tiles of German manufacturers and heat insulators (expanded polystyrene and penopoliuretan).

 10 year Warranty for work 

 

   

 

To learn more in detail about thermopanels click here!

 

              

Our company " Plitker " is engaged in manufacture of thermopanels in installation of klinkerns thermopanels and all accompanying works. Our company works in the countries of Baltic, Europe and in territory of the Russian Federation.

Own manufacture gives the chance not only to lower cost of panels, but also to reduce time of their delivery to the customer. Besides own manufacture allows to supervise quality of manufacturing of production and operatively to answer inquiries of consumers. «Plitker» constantly improves production, develops its new kinds, modernises technological processes.

To read more in detail about installation of thermopanels click here

 

Подробнее о монтаже

 

Advantages of the thermopanel 

 

Подробнее о монтаже

 

Factory controlled manufacture
Precision joinery and assembly. Not possible on the building site. Use of hi-tech polyurethane foam insulation which is the most efficient insulation yet invented [see Insulation].

Fast building times
In fact, the average house can be constructed to lock up in 5 days. Saves renting and finance costs. Can be erected by owner builder – further saving money.

Virtually maintenance free
White ants won't eat it; steel chassis floors are fire and termite proof; log wall modules permanently treated against fungal attack and termites; do not require painting. We treat the logs to 'H4' level of specification, and the CCA treatment does not create any hazard whatsoever to people or the environment. CSIRO verification is available.

To learn more in detail about advantages of thermopanels click here!

 

1
2
  4

 

 


 

 

Last Updated on Tuesday, 17 November 2009 11:15